S-115 Highway
[Overview] The S-115 highway is a 6 to 8 land highway going from S-15 to the Valley Road Turnpike. All within New Liverpool. It was built between 1989 and 1991 as the New Liverpool Northern Ring Road. It is 28 miles (45 km) long and is the busiest highway that has 3 digits and the longest to be in only one province or provincial equivalent.
Exits
Exit 1A: Lambert Rd
Exit 1b: Scola Ave
Exit 2: Northrock Stadium and Northrock Blvd
Exit 4: Culver Ave
Exit 5: Xiamen Ave
Exit 7a: Northern Valley Parkway PH-7
Exit 7b: Capitol Blvd
Exit 9: Mount Longley Park
Exit 10: Morgantown Rd
Exit 13: Beeland Ave
Joseph Longley Service Station(Both Directions)
Exit 14: Northern Link Road
Exit 16: Silverado Turnpike
Exit 17a Airport Drive
Exit 17b Airport Ring Parkway
Exit 19: 7th St W
Exit 20: 12th St W
Exit 22: 17th St
Exit 23: 22nd St
Exit 24: 27th St
Exit 25a: 33rd St
Exit 25b: 36th St
Exit 26: Southland Rd
Exit 27a: S-20
Exit 27b: Southland River Parkway
Exit 28a: Valley Road Turnpike
Exit 28b: 76th St
Exit 28c: Southbank Rd