S-115 Highway: Difference between revisions

From IDU Wiki
Jump to navigation Jump to search
(Created page with "(S-115 Highway) The S-115 highway is a 6 to 8 land highway going from S-15 to the Valley Road Turnpike. All within New Liverpool.")
 
No edit summary
Line 1: Line 1:
(S-115 Highway)
[Overview]]
The S-115 highway is a 6 to 8 land highway going from S-15 to the Valley Road Turnpike. All within [[New Liverpool]].
The S-115 highway is a 6 to 8 land highway going from S-15 to the Valley Road Turnpike. All within [[New Liverpool]]. It was built between 1989 and 1991 as the New Liverpool Northern Ring Road. It is 38 miles(61 km) long and is the busiest highway that has 3 digits and the longest to be in only one province or provincial equivalent.
 
[Exits]
Exit 1A: Lambert Rd
Exit 1b: Scola Ave
Exit 2: Northrock Stadium and Northrock Blvd
Exit 4: Culver Ave
Exit 5: Xiamen Ave
Exit 7a: Northern Valley Parkway PH-7
Exit 7b: Buford St
Exit 9: Mount Longley Park

Revision as of 16:27, 18 September 2020

[Overview]] The S-115 highway is a 6 to 8 land highway going from S-15 to the Valley Road Turnpike. All within New Liverpool. It was built between 1989 and 1991 as the New Liverpool Northern Ring Road. It is 38 miles(61 km) long and is the busiest highway that has 3 digits and the longest to be in only one province or provincial equivalent.

[Exits] Exit 1A: Lambert Rd Exit 1b: Scola Ave Exit 2: Northrock Stadium and Northrock Blvd Exit 4: Culver Ave Exit 5: Xiamen Ave Exit 7a: Northern Valley Parkway PH-7 Exit 7b: Buford St Exit 9: Mount Longley Park